{"site":"nergy.in","path":"/products/ab-g12r-132-600-mundra-solar-pv-ltd-ahmedabad-gujarat-co-almm","title":"AB-G12R-132-600","generated_at":"2026-11-02T12:58:29.507Z","data":{"site":"nergy.in","product_key":"slug:mundra-solar-pv-ltd-ahmedabad-gujarat-co-almm/ab-g12r-132-600","slug":"ab-g12r-132-600-mundra-solar-pv-ltd-ahmedabad-gujarat-co-almm","org_key":"slug:mundra-solar-pv-ltd-ahmedabad-gujarat-co-almm","category":"pv_module","model":"AB-G12R-132-600","specs":{"module_type":"Bifacial N-Type TOPCon Module (Glass to Glass)","applied_model":"AB-G12R-132-610","rated_power_wp":610,"module_efficiency_pct":22.21,"cells":"132 (Half Cut)","system_voltage_v":1500},"listing":{"list":"MNRE ALMM List-I (solar PV modules)","bis_registration":"R-72012025","enlisted_capacity_mw_per_year":650,"valid_from":"2026-09-16","valid_to":"2026-11-27","revision_date":"2026-09-16","source_page":8,"source_pdf":"https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2026/09/202609161469951718.pdf","note":"Enlistment runs four years subject to a valid BIS registration; an entry can lapse without a revision saying so."},"status":"published","provenance":[{"field":"model","from":"mnre_almm","observed_at":"2026-09-16","url":"https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2026/09/202609161469951718.pdf"}],"first_seen":"2026-10-25T12:47:26.962Z","last_verified":"2026-09-16","maker":{"key":"slug:mundra-solar-pv-ltd-ahmedabad-gujarat-co-almm","name":"Mundra Solar PV Ltd., Ahmedabad, Gujarat. (Co-ALMM)"}}}